Recap of EOSS-112
Return to Main Recap Page
Launch Site Payloads
by Steve Osborne, KC0YA

Payloads laid out on tables and being prepped and attached to flight string

Parachute, spreader ring and cutdown module

AE0SS-11 APRS system

NOAA AirCore with its telemetry packages attached


Valve used to seal the AirCore when recovery teams reach it. |