|
| |
Launch Site Photos
by Ann Foster, KØANN
Back to EOSS-76 Recap

Pre-launch instructions on procedures

Big Blue Glider

Large housing to the left, the wings awaiting inflation. Directly behind
(right) in a cylindrical container, the parachute, then the tail assembly.
The blue box to the far right houses the inflation components and is left
behind on the flight string when the glider separates.

Full Payload train laid out ready to go.
|